Skip to content

CASE STUDY

New Headquarters for Early Head Start, Inc.

Project: New Headquarters for Early Head Start, Inc.

Customer: Toro Arquitectos

Timeline: Completed

Key Challenge: KEPSC provides civil design services.

Solution Approach: Education is the foundation for success of our children. Working to provide better facilities for our children and those who serve them directly is imperative to ensure the future success of our communities. By maximizing the potential of the site’s topography and geometry based on the proposed architectural improvements presented for the building of the new headquarters, the KEPSC team efficiently transformed the site to serve its intended functionality.

“We may not be able to prepare the future for our children, but we can at least prepare our children for the future.” — Franklin D. Roosevelt.

“Children are the world’s most valuable resource and its best hope for the future.” — John F. Kennedy.

Key Partners: Toro Arquitectos [https://toroarquitectos.com/es/ciales/]

Results: KEPSC successfully delivered the project on-time and on-budget.

The exceptional design of this project has been honored with prestigious accolades, including the 2025 AIA Merit Award of Excellence for New Work (Florida) and the 2025 AIA Honor Award of Excellence for Built Work (Puerto Rico).